Post-installation Guidelines
Cover the taps / mixers with poly pack after installations, till they are put to regular use, to protect the finish from dust, strains, paint, chemicals and damages.
Dont´t use harsh cleaning agents like acids, alkalizes and abrasives. Use soft sponge or wet cloth with soap water or 100% dilluted vinegar to clean the fittings. However fine chalk powder can be used to shine the taps.
Clean the aertaors (Foam Flow) at regular intervals to maintain good flow of water.
Fittings should be operated gently while turning off. Over-tightening gives friction to threads that reduce the files of the fitting.
Do not lean or put excessive weight on taps. Excessive weight can damage or even break the taps.
The following chart gives you an indication of the minimum required for getting a good performance from bath fittings.
S.No | Product | Min.Press. In Lb.Sq.in | Min.Press. KGF/sq. cm | Min.Press. In Terms of Height of Tank |
---|---|---|---|---|
1 | QT, H/T or F/T fittings with Single Spindle | 10 PSI | 0.7 Kgf | 07 meters |
2 | Q/T, H/T or F/T Mixers | 15 PSL | 1 Kgf | 10 meters |
3 | Single Lever Mixers | 20 PSI | 1.5 Kgf | 15 meters |
4 | Single Function Showers | 15 PSI | 1 Kgf | 10 meters |
5 | Multi Function Showers | 30 PSI | 2 Kgf | 20 meters |
6 | Flush Valves and Flush Cocks | 07 PSI | 0.7 Kgf | 207 meters |